MOD

TOM Design Checklist

Used in STEP 7
A glimpse inside
Preview of the MOD worked example — structure and colouring shown, detail deliberately softened
5 tabs: Cover · checklist · workforce plan · Meridian worked example · workforce example. Ten operating-model criteria scored Yes / Partial / No, from organisation design and the workforce plan through to resilience and BAU ownership, with a second table that tracks each AS-IS operational risk to the TOM change that mitigates it and the residual exposure. A separate tab, the workforce calculator, sizes each role from the work it has to do.

In a sentence — confirm the target operating model actually supports the redesigned process across every layer — not just the layer that was easiest to redesign — and size each role from the work it has to do.

£55 + VAT Buy now or Get all 12, discounted →

Sold under the Optimize10 Toolkit Licence Terms, which you will be asked to accept at checkout. The licence covers use within the purchasing organisation only. Buying for more than one company in a group, or for consulting or training work? Contact us.

What this tool does

Structure gets redesigned. Process gets redesigned. Then a new operating model quietly inherits the old technology, the old sourcing decisions, or the old resilience gaps, because nobody checked every layer at once. This tool tests the whole model — customer outcomes, processes, organisation and roles, governance and decision rights, sourcing, capabilities, and technology and data — against the same explicit criteria, so nothing gets waved through by default.

Operational resilience gets its own dedicated criterion rather than being folded into ‘technology’ or treated as a control bolted on afterwards: it is the foundation every other layer rests on. It means the model keeps critical services running through an outage, a key-person absence, or a third-party failure — not just that it works on a good day, which is the same discipline the method applies to the TOM stage generally.

A second tab sizes the organisation the checklist has just tested. For each role you enter the annual volume, the touch time per case and the productive hours one person really delivers; the sheet works out the workload, the people required once an allowance for peaks and cover is added, and the gap against the people you have. It is the demand-driven workforce plan from Technique 7.4 of the book: a headcount that comes from the work, not one carried over from the old structure.

WHY THIS HELPS

Risk trend is tracked separately from risk severity, and the register itself is a separate test from the checklist above it: the checklist asks whether the design criteria are formally met, the register asks whether the operating model actually reduces the risks recorded back in MAP. A High-risk item trending Reduced and one trending Increased look identical on a severity-only view; a tidy checklist next to an unmoved risk register is the sheet telling you something's wrong.

HOW MOVEMENT IS CALCULATED

Under the hood, Low/Medium/High/Critical is converted to 1/2/3/4 for both the AS-IS exposure and the Residual exposure you enter, and Movement is simply whichever way that number changed — Reduced if Residual is the lower number, Increased if it's higher, No change if they're equal. That means a shift from High to Medium counts exactly the same as a shift from Medium to Low: one severity step, regardless of which two labels are involved. It also means you can't fudge a small win into a big one — there's no partial credit for ‘still High but a bit better’. If a risk hasn't moved a whole severity band, the sheet correctly shows No change, which is often the more honest and more useful signal at this stage of a design.

What's included

MOD · TOM Design Checklist — the blank tool

Ready to complete for your own engagement. Blue-tinted cells are for you to fill in.

Worked example

The same tool completed end to end, using the fictional Meridian Wealth Management scenario — see what ‘done’ looks like before you start your own.

MOD · Workforce Plan — the calculator

One row per role. Workload, people required and the gap calculate themselves from the figures you enter.

Workforce example

The calculator completed for one illustrative role, using the same figures as Figure 7.4 in the book. Deliberately generic, and not part of the Meridian scenario.

How it's used

A quick walkthrough of the sheet:

Using this tool
1Work through each design criterion and set Met? to Yes, Partial, No or N/A.
2Test across every layer of the TOM — customer outcomes, processes, organisation and roles, governance and decision rights, sourcing, capabilities, technology and data — not just the one furthest along.
3Treat operational resilience as its own criterion and the foundation of the model, not an afterthought folded into technology.
4Record evidence, a named owner, and a gap action wherever the answer isn't Yes.
5Watch the risk-closure table separately — High and Critical exposures are flagged, and the trend colours itself Reduced (green) or Increased (red).
6Then open the Workforce Plan tab: one row per role, with volume, touch time, productive hours and allowance entered. Workload, people required and the gap calculate themselves.
7Choose how each gap closes — build, buy, borrow or redeploy — and enter the number needed in transition, which is often higher than steady state.
The checklist's own columns: #, Design criterion, Met?, Evidence, Owner, Action if gap. The Workforce Plan tab's: Role, Annual volume, Touch time per case, Workload, Productive hours, People before allowance, Allowance, People required, People available, Gap, How the gap closes, People needed in transition, Notes.